{"id":544,"date":"2024-08-19T16:12:31","date_gmt":"2024-08-19T15:12:31","guid":{"rendered":"https:\/\/riogroup.co.uk\/surfacing\/?post_type=avada_portfolio&#038;p=544"},"modified":"2025-06-11T16:39:55","modified_gmt":"2025-06-11T15:39:55","slug":"fenland-district-council","status":"publish","type":"avada_portfolio","link":"https:\/\/riogroup.co.uk\/surfacing\/projects\/fenland-district-council\/","title":{"rendered":"Fenland District Council"},"content":{"rendered":"<ul>\n<li style=\"font-weight: 400;\">\n<h4>Fenland District Council &#8211;\u00a0Highway Reconstruction &amp; Improvement Works to Access Road<\/h4>\n<\/li>\n<li style=\"font-weight: 400;\">\n<h4>Cambridgeshire<\/h4>\n<\/li>\n<\/ul>\n<p style=\"font-weight: 400;\">Following the Council\u2019s stringent contractor vetting procedure, Rio Surfacing were successful in our bid to carry out urgent reconstruction works to an aged and heavily worn residential access road and path leading to a community recreation ground.<\/p>\n<p style=\"font-weight: 400;\">These works primarily involved:<\/p>\n<ul style=\"font-weight: 400;\">\n<li>The excavation and reconstruction of the existing carriageway to remove the existing inadequate construction, with its undulating\u00a0reinforced concrete slab surfaces\u00a0and\u00a0patch\u00a0areas of deteriorating macadam surface.<\/li>\n<li>Installation of new\u00a0precast concrete\u00a0kerbing laid to new levels\u00a0along both sides of the carriageway, incorporating pedestrian and vehicular crossing points at relevant locations\u00a0to service properties.<\/li>\n<li>Installation of new\u00a0precast concrete drainage\u00a0channels installed along both sides\u00a0of the straight sections of carriageway\u00a0to aid in removal of rain and storm water from the new carriageway.<\/li>\n<li>Installation of a new\u00a0drainage\u00a0gully\u00a0points\u00a0and connection\u00a0to the existing storm water relief system in the main carriageway.<\/li>\n<li>Profiling of existing sub strata and completion of CBR testing prior to installation of capping layer and sub base to road and footpath areas.<\/li>\n<li>The resurfacing of the existing concrete and macadam footways, together with the tie in to the recreation ground entrance.<\/li>\n<li>Other minor associated works as required, such as installation of new\u00a0precast\u00a0edgings, replacement of\u00a0inspection covers, adjustment of\u00a0existing covers\u00a0and reinstatement of\u00a0road markings.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Cambridgeshire<br \/>\nFenland District Council<\/p>\n","protected":false},"author":1,"featured_media":547,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","format":"standard","meta":{"footnotes":""},"portfolio_category":[32,29,35,36,30,28,27,34,31],"portfolio_skills":[],"portfolio_tags":[],"class_list":["post-544","avada_portfolio","type-avada_portfolio","status-publish","format-standard","has-post-thumbnail","hentry","portfolio_category-fencing-access-control","portfolio_category-groundworks-drainage","portfolio_category-hard-soft-landscaping","portfolio_category-hardstandings","portfolio_category-kerbing-paving","portfolio_category-roadmarkings-lining","portfolio_category-roads-footpaths","portfolio_category-site-investigation-works","portfolio_category-suds"],"_links":{"self":[{"href":"https:\/\/riogroup.co.uk\/surfacing\/wp-json\/wp\/v2\/avada_portfolio\/544","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/riogroup.co.uk\/surfacing\/wp-json\/wp\/v2\/avada_portfolio"}],"about":[{"href":"https:\/\/riogroup.co.uk\/surfacing\/wp-json\/wp\/v2\/types\/avada_portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/riogroup.co.uk\/surfacing\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/riogroup.co.uk\/surfacing\/wp-json\/wp\/v2\/comments?post=544"}],"version-history":[{"count":1,"href":"https:\/\/riogroup.co.uk\/surfacing\/wp-json\/wp\/v2\/avada_portfolio\/544\/revisions"}],"predecessor-version":[{"id":545,"href":"https:\/\/riogroup.co.uk\/surfacing\/wp-json\/wp\/v2\/avada_portfolio\/544\/revisions\/545"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/riogroup.co.uk\/surfacing\/wp-json\/wp\/v2\/media\/547"}],"wp:attachment":[{"href":"https:\/\/riogroup.co.uk\/surfacing\/wp-json\/wp\/v2\/media?parent=544"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/riogroup.co.uk\/surfacing\/wp-json\/wp\/v2\/portfolio_category?post=544"},{"taxonomy":"portfolio_skills","embeddable":true,"href":"https:\/\/riogroup.co.uk\/surfacing\/wp-json\/wp\/v2\/portfolio_skills?post=544"},{"taxonomy":"portfolio_tags","embeddable":true,"href":"https:\/\/riogroup.co.uk\/surfacing\/wp-json\/wp\/v2\/portfolio_tags?post=544"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}