-
Leighfield Road Resurfacing & Lining Works
-
Coventry
-
University of Warwick
Working directly for the University of Warwick, in 2023, Rio Surfacing were selected to complete the preparation and resurfacing of Leighfield Road within the main university campus. As part of the vetting process, we formulated a programme of works together with carefully considered traffic management scheme and safe method of working to ensure effective completion of the works within the summer break. Working under a 1-week road closure the existing surfaces were removed and replaced with carriageway specification – all works were successfully completed in the agreed timescales and handed back to the client.
The works included: Provision of traffic management scheme to National Highways approved code of practice, cold milling/planing to existing surface course, removal of all waste to recycling facility, repairs to kerbs and drainage channels, installation of new HRA asphalt surfaces, thermoplastic lining, application of high friction anti-skid surfaces and general site clearance.