Stoke Minster CE Primary Academy
-
Pitched & Falt Roof Refurbishment – Marley
Scope of Work
The scope of work was extensive and involved multiple phases:
- Pitched Roofing Installation:
- We installed high-quality pitched roofing across several sections of the school building, using premium materials that complied with the latest industry standards. This included materials designed to withstand the local weather conditions and ensure the long-term performance of the roof.
- Flat Roofing Systems:
- In addition to the pitched roof, we installed modern flat roofing solutions in designated areas, incorporating the latest waterproofing and insulation technologies to enhance the roof’s durability and energy efficiency.
- M&E Ventilation System Alterations:
- Significant modifications were made to the kitchen ventilation systems, including upgrades to accommodate improved air circulation and compliance with modern building regulations. Our team worked closely with the school’s facilities management and M&E contractors to integrate the new systems seamlessly into the building’s structure.
- Coordination and Operational Continuity:
- Given the sensitive nature of working within a live school environment, we coordinated carefully with Stokeminster School to ensure that the school could continue to operate as normal. This required meticulous planning and scheduling to minimize disruption to classes, events, and the school’s daily operations.
- Specific work, such as roofing and ventilation system installation, was carried out during school holidays or outside of regular school hours to ensure a smooth process without affecting the school’s functionality.
- Window Replacement:
As part of the project, we replaced all windows throughout the school to improve energy efficiency, insulation, and security. The new windows not only enhanced the building’s aesthetic appeal but also helped reduce energy costs, contributing to a more sustainable and comfortable learning environment.
Challenges and Solutions
One of the primary challenges was maintaining the school’s operational integrity while working on both pitched and flat roofing sections and undertaking significant M&E alterations. Our team had to work closely with the school’s facilities team to align work schedules and identify appropriate periods when the school could operate without disruption.
To address this challenge, we implemented the following solutions:
- Careful Planning and Scheduling: We coordinated with the school to schedule noisy or intrusive work during school holidays or after hours, ensuring minimal disruption to students and staff.
- Continuous Communication: Regular updates and open communication channels were maintained throughout the project to ensure the school was fully aware of the progress and any necessary changes.
- Safety and Access Control: As the project involved working in an active school environment, we ensured that all safety protocols were strictly followed, and appropriate access controls were put in place to protect the students, staff, and contractors.
Outcome
The roofing installation project was completed successfully, with all aspects—pitched roofing, flat roofing, and M&E alterations—delivered to the highest standards. The school’s facilities were enhanced with a fully functional and modern roof system, providing better insulation, water resistance, and improved energy efficiency.
Additionally, the upgraded kitchen ventilation system significantly improved air quality and ventilation, meeting the required health and safety standards for food preparation areas. All work was completed within the agreed timeframe, and the school was able to maintain full operational capacity throughout the duration of the project.
Conclusion
Rio’s ability to manage complex projects with multiple moving parts, such as pitched and flat roofing installations combined with M&E alterations, highlights our expertise and commitment to delivering quality results. By working closely with Stokeminster School and ensuring minimal disruption, we were able to complete the project on time and within budget, leaving behind a durable, efficient, and compliant roofing system that will serve the school for years to come.
We are proud of our partnership with Stokeminster School and the successful completion of this multifaceted project.