- Castle Terrace Edinburgh – NCP
- Multi Storey Car Park Refurbishment
Castle Terrace is one of the busiest car parks in Edinburgh, sitting just below the Castle itself, it is popular with both Tourists and office staff. When NCP appointed Rio to Carry out the top deck refurbishment, we knew it would be a logistical challenge, as the car park is built into the hill with access via both top and bottom of the car park. The Car park was to remain open for the duration of the works with access and egress via the top decks we were refurbishing.
The deck was a unique, almost figure of eight design with down on the left and up on the right with a central cross over point. The works covering 7,000m², consisted of the removal of the existing asphalt covering and replacing with an IKO Permapark Mastic Asphalt System. Work was carried out over a 12 week period with a 20 Year Material and workmanship warranty issued on completion.